(MRTS) MASS RAPID TRANSIT SYSTEM

(MRTS) Mass Rapid Transit System

As cities grow in size, the number of vehicular trips on road system goes up. This necessitates a pragmatic policy shift to discourage private modes and encourage public transport once the level of traffic along any travel corridor in one direction exceeds 20,000 persons per hour.

Introduction of a rail based (MRTS) Mass Rapid Transit System is called for. Mass Rapid Transit Systems are capital intensive and have long gestation period. It has been observed that in developed countries, planning for mass transit system starts when city population size exceeds 1 million; the system is in position by the time the city population is 2 to 3 million and once the population exceeds 4 million or so, planned extensions to the Mass Rapid Transit Systems is vigorously taken up. In developing countries including India, because of paucity of funds planning and implementation of rail based Mass Rapid Transit Systems has been lagging far behind the requirements.

The city of Delhi with a population of round 12 (16.2) million should have had an MRTS network of at least 100 (300) KM by this time, whereas actually it is still (65.10 kms) at the take-off stage. Delhi has all the ideal dress-up for an excellent Mass Rapid Transit System to be brought in. It has wide roads (roads cover 23% of the city area) where road possession for construction is not difficult (except in the old city area). Implementation will also not involve demolition of large scale private properties. Most of the land required is under Government control and hence can be easily acquired.

History